We were called in by the church to carry out some belfry maintenance. The following were the the main items we were asked to deal with.
- The topmost stone on the belfry had been badly cracked and destabilised by the expansion of the rusting iron dowel inside it. As there is a public walkway underneath the belfry, this had to be treated as a priority.
- It was felt that the main body of the belfry needed lateral stabilisation.
- The belfry required pointing.
- The bell wheel was very loosely fixed.