The skills of the steeplejack are obviously useful when attempting any kind of repair or maintenance work on bridges.
We have carried out many contracts of this type, and we welcome further enquiries of this type.
Stone Indenting, stabilisation, and pointing works.
This bridge is near Braemar. The timber had rotted badly at the point where it entered the wall and the bridge was shut down until repairs were completed.
We removed the rotten section and fitted these new stainless steel fishplates. It is no longer possible for water to collect at the base of the timbers, so the rot will not return.
Dismantled previous timber suspension bridge and erected a brand new metal bridge. All groundworks, pylon erection, bridge suspension, etc, were completed by BCM.
More on this can be found on this pagein our case studies section.
This contract was very similar to the one above. We dismantled the old bridge and erected this attractive new one. More information can be foundhere.